Operations console
Operations overview
Leading indicators first. Job counts and revenue sit one level down, because optimising them directly would optimise the wrong thing.
kWh recovered (30-day run rate)
85.9 MWh
Across 111 completed visits with before and after readings
Fleet performance ratio
72.4%
Capacity-weighted across 28 sites, last 30 days
72.4% against a 82% targetbelow target
SLA compliance
92.8%
103 of 111 closed jobs met their promised window
92.8% against a 95% targetbelow target
kW under contract
1,053 kW
11 active contracts, 5 at renewal risk
Driven by measured performance drift, not a cleaning calendar. The money column is what the customer is losing every month while the dust sits there.
| Site | Soiling loss | Days since clean | Losing per month |
|---|---|---|---|
| Metro Warehousing Islamabad · 150.0 kW | 17.1% | 124 | Rs 1.3L |
| Al-Noor Textile Mills Islamabad · 100.0 kW | 15.2% | 94 | Rs 75.6K |
| Green Valley School Rawalpindi · 200.0 kW | 8.7% | 72 | Rs 74.8K |
| Shahzad Motors Multan · 60.0 kW | 17.5% | 41 | Rs 46.3K |
| Rehmat Flour Mills - Unit 2 Karachi · 50.0 kW | 14.7% | 99 | Rs 38.3K |
| Pak Agro Farms - Unit 2 Karachi · 60.0 kW | 8.1% | 111 | Rs 26.4K |
| Gulberg Galleria Faisalabad · 32.0 kW | 14.4% | 44 | Rs 24.6K |
| Sunrise Poultry Farm Multan · 25.0 kW | 17.1% | 80 | Rs 22.2K |
14 visits booked for today
- Fire Safety Inspection
Ayesha Malik · Faisalabad
8:00 AM
In progress - Waterless Panel Cleaning
Sunrise Poultry Farm · Multan
9:00 AM
In progress - Off-Grid Solar System
Nadia Rehman · Faisalabad
11:00 AM
In progress - Warranty Claims
Sana Iqbal · Karachi
11:00 AM
Dispatched - Electrical Safety Audit
Crescent Plaza - Unit 1 · Faisalabad
12:00 PM
Dispatched - Inverter Repair & Maintenance
Sana Iqbal · Karachi
12:00 PM
Dispatched - Panel Angle Optimization
Usman Tariq · Multan
12:00 PM
Dispatched
Open jobs due within 12 hours, soonest first.
- JOB-2026-015418 hrs late
Net Metering Assistance
- JOB-2026-008017 hrs late
Warranty Claims
- JOB-2026-008417 hrs late
Dust & Debris Removal
- JOB-2026-015714 hrs late
Inverter Repair & Maintenance
- JOB-2026-005613 hrs late
Free Site Survey
- JOB-2026-011513 hrs late
Earthing Resistance Testing
Unresolved defects recorded on site.
- Hotspot detected on string BCritical
JOB-2026-0002
JOB-2026-0005
- Hotspot detected on string BCritical
JOB-2026-0021
- Hotspot detected on string BCritical
JOB-2026-0028
JOB-2026-0030
- Hotspot detected on string BCritical
JOB-2026-0031
Repeat call-outs mean the root cause was never fixed. Rising here is a warning, not a revenue win.
Where the pipeline is sitting right now.
Booked hours against weekly capacity.
- Shoaib Akhtar82% · 2 open
- Junaid Khan82% · 3 open
- Waqar Ahmed76% · 5 open
- Tahir Mahmood76% · 4 open
- Naveed Iqbal73% · 7 open
- Faisal Shahzad73% · 2 open
Targets held for EPCore: SLA 95%, performance ratio 82%. Both are absolute, not rolling averages, so a slipping standard stays visible. Data last modelled 11 days ago.