Operations console
Metro Warehousing
150.0 kW On-Grid system in Islamabad, commissioned 22 Jun 2025
System health
76
Performance ratio against baseline, less open defects
Generated (30 days)
14.3 MWh
84% of expected
Modelled soiling loss
17.1%
Last cleaned 16 Apr 2026
Performance ratio
69.8%
Baseline 83%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 150.0 kW
- System type
- On-Grid
- Modules
- 275 x 545W Jinko
- Inverter
- GoodWe DNS-G3-150K (135.0 kW)
- Battery
- None
- Tilt / azimuth
- 22 deg / 185 deg
- Bird mesh
- Installed
- Tariff
- Rs 44 per kWh
- Net metering
- Approved
- NM reference
- NM-2026-74435
- Sanctioned
- 150 kW
- AMC
- Commercial Pro
Unresolved defects on this site.
Earthing resistance above limit
MajorMeasured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
5 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0011 | Smart Energy Monitoring App Setup | Completed | Rs 6.5K |
| JOB-2026-0020 | Solar Panels with UPS Connection | Completed | Rs 14.5K |
| JOB-2026-0147 | Warranty Claims | Completed | Rs 4.5K |
| JOB-2026-0090 | Solar Panel Deep Cleaning | Completed | Rs 60.5K |
| JOB-2026-0125 | Performance Testing | Completed | Rs 9.0K |
- Electrical Safety AuditScore 80
1 Mar 2026
- Thermal Camera InspectionScore 85
19 Jun 2026
Generation figures are modelled against the design estimate for this system.