Operations console

Quotes

Installation quotes are priced per watt. Cleaning, repair and inspection never are, they are per visit, per panel or by system size.

Open pipeline

Rs 73.5L

0 sent, awaiting decision

Won value

Rs 69.0L

6 accepted quotes

Win rate

75%

8 decided quotes

Total quotes

14

QuoteCustomerKindSystem sizeTotalValid untilStatus
QTE-2026-004

8 Aug 2026

Crescent PlazaInstallation (per watt)10.0 kWRs 372,7757 Sep 2026Rejected
QTE-2026-007

6 Aug 2026

Sunrise Poultry FarmService-Rs 21,52412 Sep 2026Expired
QTE-2026-002

20 Jul 2026

Sunrise Poultry FarmInstallation (per watt)5.0 kWRs 129,5002 Aug 2026Draft
QTE-2026-010

4 Jul 2026

Hina QureshiInstallation (per watt)15.0 kWRs 539,73815 Aug 2026Accepted
QTE-2026-012

3 Jul 2026

Pak Agro FarmsInstallation (per watt)25.0 kWRs 594,0002 Sep 2026Rejected
QTE-2026-011

27 Jun 2026

Sunrise Poultry FarmInstallation (per watt)25.0 kWRs 165,00025 Sep 2026Draft
QTE-2026-013

25 Jun 2026

Fatima SheikhInstallation (per watt)15.0 kWRs 483,07527 Sep 2026Draft
QTE-2026-014

23 Jun 2026

Hina QureshiInstallation (per watt)100.0 kWRs 4,636,00020 Aug 2026Draft
QTE-2026-009

21 Jun 2026

Ayesha MalikInstallation (per watt)100.0 kWRs 5,548,0002 Sep 2026Accepted
QTE-2026-006

18 Jun 2026

Ayesha MalikService-Rs 13,00020 Sep 2026Accepted
QTE-2026-008

7 Jun 2026

Pak Agro FarmsInstallation (per watt)50.0 kWRs 735,0003 Aug 2026Accepted
QTE-2026-005

4 Jun 2026

Green Valley SchoolService-Rs 12,8702 Aug 2026Accepted
QTE-2026-003

23 May 2026

Chughtai Diagnostic CentreInstallation (per watt)5.0 kWRs 56,00010 Sep 2026Accepted
QTE-2026-001

23 May 2026

Bilal AnwarInstallation (per watt)100.0 kWRs 1,940,00018 Aug 2026Draft