Operations console
Green Valley School
200.0 kW Hybrid system in Rawalpindi, commissioned 4 Oct 2021
System health
85
Performance ratio against baseline, less open defects
Generated (30 days)
20.2 MWh
89% of expected
Modelled soiling loss
8.7%
Last cleaned 7 Jun 2026
Performance ratio
71.2%
Baseline 80%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 200.0 kW
- System type
- Hybrid
- Modules
- 323 x 620W Longi
- Inverter
- Huawei SUN2000-200K (180.0 kW)
- Battery
- 5 kWh
- Tilt / azimuth
- 14 deg / 200 deg
- Bird mesh
- Not installed
- Tariff
- Rs 38 per kWh
- Net metering
- Approved
- NM reference
- NM-2026-53094
- Sanctioned
- 200 kW
- AMC
- Annual Plus
Unresolved defects on this site.
Monitoring app not configured
InfoCustomer has no visibility of live generation. App setup offered.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
3 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0074 | Electrical Safety Audit | Scheduled | Rs 15.0K |
| JOB-2026-0066 | Shade Analysis | Completed | Rs 8.5K |
| JOB-2026-0004 | Hotspot Detection | Completed | Rs 1.3L |
No reports for this site
Generation figures are modelled against the design estimate for this system.