Operations console
Customers
Shahzad Motors
60.0 kW Hybrid system in Multan, commissioned 28 Aug 2022
System health
84
Performance ratio against baseline, less open defects
Generated (30 days)
5.7 MWh
84% of expected
Modelled soiling loss
17.5%
Last cleaned 8 Jul 2026
Performance ratio
66.7%
Baseline 79%, target 82%
Generation, expected against actual
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Soiling loss
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Performance ratio trend
Against the fleet target.
System specification
- Capacity
- 60.0 kW
- System type
- Hybrid
- Modules
- 110 x 545W JA Solar
- Inverter
- Fronius Primo-60K (54.0 kW)
- Battery
- 20 kWh
- Tilt / azimuth
- 22 deg / 185 deg
- Bird mesh
- Not installed
- Tariff
- Rs 39 per kWh
- Net metering
- Approved
- NM reference
- NM-2022-34532
- Sanctioned
- 60 kW
- AMC
- Commercial Pro
Open findings
Unresolved defects on this site.
No open findings
Work order history
8 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0097 | Fuse Replacement | Requested | Rs 1.9K |
| JOB-2026-0102 | Cable Replacement | Scheduled | Rs 13.8K |
| JOB-2026-0059 | Complete Inspection & Checkup | Requested | Rs 7.5K |
| JOB-2026-0069 | Hybrid Solar System | Completed | Rs 32 |
| JOB-2026-0078 | Drone Solar Inspection | Cancelled | Rs 54.0K |
| JOB-2026-0159 | Insurance Inspection | Completed | Rs 9.5K |
| JOB-2026-0012 | Lightning Protection | Completed | Rs 1.1L |
| JOB-2026-0043 | Emergency Breakdown Service | Invoiced | Rs 12.5K |
Inspection reports
- String TestingScore 69
13 May 2026
Generation figures are modelled against the design estimate for this system.