Hybrid Solar System

JOB-2026-0069 - raised via Portal 2 days ago

CompletedNormal priorityCommercial Pro AMC
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Heavy soiling on lower rows

    Minor

    Dust accumulation reducing output on the two lowest rows more than the rest of the array.

    Resolved

Parts used

Consumed from van stock on this visit.

PartQtyUnit costLine total
Torque Wrench Calibration1Rs 9,741Rs 9,741
String Fuse 15A2Rs 2,645Rs 5,290
Result

Generation either side of the visit.

+23 kWhper day

211 kWh before, 234 kWh after

Worth about Rs 26,910 a month at this site's tariff.

Assignment

Technician

Naveed Iqbal
Details
City
Multan
Capacity
60.0 kW
Raised
16 Aug 2026, 12:00 PM
Scheduled
16 Aug 2026, 3:00 PM
SLA due
16 Aug 2026, 8:00 PM (2 days ago)
Completed
16 Aug 2026, 3:00 PM
Services
Hybrid Solar System
Amount
Rs 32