Operations console

All work orders

Insurance Inspection

JOB-2026-0002 - raised via Website 7 days ago

CompletedLow priorityAnnual Plus AMC
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Hotspot detected on string B

    Critical

    Thermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.

    Open

  • Burnt MC4 connector

    Critical

    DC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.

    Resolved

  • Bird nesting under array

    Minor

    Pigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.

    Open

Parts used

Consumed from van stock on this visit.

No parts consumed

Result

Generation either side of the visit.

+14 kWhper day

75 kWh before, 89 kWh after

Worth about Rs 20,580 a month at this site's tariff.

Assignment

Technician

Junaid Khan
Details
City
Karachi
Capacity
25.0 kW
Raised
11 Aug 2026, 9:00 AM
Scheduled
11 Aug 2026, 4:00 PM
SLA due
12 Aug 2026, 9:00 AM (6 days ago)
Completed
11 Aug 2026, 4:00 PM
Services
Insurance Inspection
Amount
Rs 9,500