Operations console
Rehmat Flour Mills - Unit 1
25.0 kW Hybrid system in Karachi, commissioned 6 Aug 2024
System health
76
Performance ratio against baseline, less open defects
Generated (30 days)
2.5 MWh
90% of expected
Modelled soiling loss
13.8%
Last cleaned 12 Apr 2026
Performance ratio
72.8%
Baseline 81%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 25.0 kW
- System type
- Hybrid
- Modules
- 46 x 545W Jinko
- Inverter
- GoodWe DNS-G3-25K (22.5 kW)
- Battery
- 5 kWh
- Tilt / azimuth
- 16 deg / 170 deg
- Bird mesh
- Not installed
- Tariff
- Rs 49 per kWh
- Net metering
- Approved
- NM reference
- NM-2023-66615
- Sanctioned
- 25 kW
- AMC
- Annual Plus
Unresolved defects on this site.
Hotspot detected on string B
CriticalThermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
4 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0127 | Commercial Solar Installation | Scheduled | Rs 26 |
| JOB-2026-0002 | Insurance Inspection | Completed | Rs 9.5K |
| JOB-2026-0036 | Waterless Panel Cleaning | Invoiced | Rs 12.0K |
| JOB-2026-0072 | MC4 Connector Replacement | Invoiced | Rs 850 |
- String TestingScore 97
27 Apr 2026
Generation figures are modelled against the design estimate for this system.