Al-Noor Textile Mills
100.0 kW Hybrid system in Islamabad, commissioned 11 Jun 2020
System health
67
Performance ratio against baseline, less open defects
Generated (30 days)
9.8 MWh
87% of expected
Modelled soiling loss
15.2%
Last cleaned 16 May 2026
Performance ratio
70.5%
Baseline 81%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 100.0 kW
- System type
- Hybrid
- Modules
- 183 x 545W Canadian Solar
- Inverter
- Solis S6-GR1P-100K (90.0 kW)
- Battery
- 20 kWh
- Tilt / azimuth
- 13 deg / 185 deg
- Bird mesh
- Not installed
- Tariff
- Rs 44 per kWh
- Net metering
- Approved
- NM reference
- NM-2023-47204
- Sanctioned
- 100 kW
- AMC
- Commercial Pro
Unresolved defects on this site.
Heavy soiling on lower rows
MinorDust accumulation reducing output on the two lowest rows more than the rest of the array.
Inverter derating in afternoon peak
MajorUnit throttles above 46 degrees ambient. Cooling fins clogged with dust.
Hotspot detected on string B
CriticalThermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
8 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0033 | Bird Dropping Removal | Scheduled | Rs 3.5K |
| JOB-2026-0073 | Solar Panels with UPS Connection | Requested | Rs 14.5K |
| JOB-2026-0114 | IV Curve Testing | Completed | Rs 85.0K |
| JOB-2026-0030 | MC4 Connector Replacement | Completed | Rs 2.5K |
| JOB-2026-0034 | Drone Solar Inspection | Invoiced | Rs 90.0K |
| JOB-2026-0168 | Solar System Routine Checking | Invoiced | Rs 5.5K |
| JOB-2026-0091 | Smart Energy Monitoring App Setup | Completed | Rs 6.5K |
| JOB-2026-0028 | Performance Optimization | Completed | Rs 95.0K |
- Earthing Resistance TestingScore 90
30 May 2026
Generation figures are modelled against the design estimate for this system.