Earthing Resistance Testing

RPT-2026-005 - performed 30 May 2026 by Shoaib Akhtar

Health score

90

Measurements taken

6

1 outside reference

Findings

1

Customer visibility

Shared

Measurements

Each reading against the reference it is judged by.

MeasurementReadingReferenceResult
Open circuit voltage (string A)577 VWithin 5% of designPass
Short circuit current (string A)9.1 AWithin 8% of nameplatePass
Earth electrode resistance9 ohmBelow 5 ohmPass
Insulation resistance (DC+ to earth)59 MohmAbove 1 MohmPass
Max module temperature45 CBelow 25 C above ambientOutside reference
Performance ratio on test day68%Baseline 81%Pass
Context
Capacity
100.0 kW
Work order
JOB-2026-0034
Technician
Shoaib Akhtar
Recommendation

System is healthy. Continue the current cleaning cycle and re-inspect in six months.

Score 90 / 100
Findings

Defects recorded during this inspection.

  • Hotspot detected on string B

    CriticalResolved

    Thermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.