Operations console

All work orders

IV Curve Testing

JOB-2026-0114 - raised via AMC schedule 2 mo ago

CompletedNormal priorityCommercial Pro AMC
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Heavy soiling on lower rows

    Minor

    Dust accumulation reducing output on the two lowest rows more than the rest of the array.

    Open

  • Loose structure bolt

    Minor

    Two mid-clamps below torque specification on the north row. Retorqued.

    Resolved

Parts used

Consumed from van stock on this visit.

PartQtyUnit costLine total
Earthing Rod 5ft2Rs 27,017Rs 54,034
Module 585W Mono3Rs 10,786Rs 32,358
Result

Generation either side of the visit.

+90 kWhper day

352 kWh before, 442 kWh after

Worth about Rs 118,800 a month at this site's tariff.

Assignment

Technician

Shoaib Akhtar
Details
City
Islamabad
Capacity
100.0 kW
Raised
21 Jun 2026, 8:00 AM
Scheduled
21 Jun 2026, 11:00 AM
SLA due
21 Jun 2026, 4:00 PM (2 mo ago)
Completed
21 Jun 2026, 11:00 AM
Services
IV Curve Testing
Amount
Rs 85,000