Operations console
Gulberg Galleria
32.0 kW On-Grid system in Faisalabad, commissioned 19 Dec 2020
System health
75
Performance ratio against baseline, less open defects
Generated (30 days)
3.2 MWh
89% of expected
Modelled soiling loss
14.4%
Last cleaned 5 Jul 2026
Performance ratio
71.4%
Baseline 80%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 32.0 kW
- System type
- On-Grid
- Modules
- 52 x 620W Jinko
- Inverter
- Fronius Primo-32K (28.8 kW)
- Battery
- None
- Tilt / azimuth
- 27 deg / 185 deg
- Bird mesh
- Installed
- Tariff
- Rs 47 per kWh
- Net metering
- Renewal due
- NM reference
- NM-2024-66976
- Sanctioned
- 32 kW
- AMC
- No contract
Unresolved defects on this site.
Hotspot detected on string B
CriticalThermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
Monitoring app not configured
InfoCustomer has no visibility of live generation. App setup offered.
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0122 | Same-Day Repair | Requested | Rs 16.5K |
| JOB-2026-0143 | Net Metering Assistance | Requested | Rs 35.0K |
| JOB-2026-0108 | Hybrid Solar System | In progress | Rs 32 |
| JOB-2026-0136 | Earthing & Safety Inspection | Completed | Rs 6.2K |
| JOB-2026-0008 | Farm Solar Maintenance | Cancelled | Rs 21.0K |
| JOB-2026-0049 | Solar System Expansion | Invoiced | Rs 3.0L |
- Insulation Resistance TestingScore 97
21 May 2026