Pak Agro Farms - Unit 2
60.0 kW On-Grid system in Karachi, commissioned 6 Jun 2022
System health
85
Performance ratio against baseline, less open defects
Generated (30 days)
5.9 MWh
87% of expected
Modelled soiling loss
8.1%
Last cleaned 29 Apr 2026
Performance ratio
74.3%
Baseline 85%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 60.0 kW
- System type
- On-Grid
- Modules
- 110 x 545W Trina
- Inverter
- Solis S6-GR1P-60K (54.0 kW)
- Battery
- None
- Tilt / azimuth
- 29 deg / 200 deg
- Bird mesh
- Not installed
- Tariff
- Rs 48 per kWh
- Net metering
- Approved
- NM reference
- NM-2023-11340
- Sanctioned
- 60 kW
- AMC
- Commercial Pro
Unresolved defects on this site.
Loose structure bolt
MinorTwo mid-clamps below torque specification on the north row. Retorqued.
9 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0113 | Voltage & Current Testing | Scheduled | Rs 4.8K |
| JOB-2026-0099 | Emergency Breakdown Service | In progress | Rs 12.5K |
| JOB-2026-0085 | 24/7 Emergency Support | Scheduled | Rs 60.0K |
| JOB-2026-0128 | Loose Connection Fix | Invoiced | Rs 3.6K |
| JOB-2026-0139 | Solar Panels with UPS Connection | Completed | Rs 14.5K |
| JOB-2026-0024 | Panel Alignment & Tilt Adjustment | Invoiced | Rs 5.5K |
| JOB-2026-0110 | School & Hospital Solar Maintenance | Completed | Rs 24.0K |
| JOB-2026-0166 | Bird Mesh Installation | Invoiced | Rs 1.6L |
| JOB-2026-0109 | Solar Panel Deep Cleaning | Completed | Rs 24.2K |
- Electrical Safety AuditScore 94
12 Jul 2026
- Thermal Camera InspectionScore 61
2 May 2026