Indus Packaging Ltd
200.0 kW Hybrid system in Rawalpindi, commissioned 5 Nov 2021
System health
66
Performance ratio against baseline, less open defects
Generated (30 days)
21.3 MWh
94% of expected
Modelled soiling loss
5.7%
Last cleaned 28 Jun 2026
Performance ratio
74.8%
Baseline 79%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 200.0 kW
- System type
- Hybrid
- Modules
- 323 x 620W Canadian Solar
- Inverter
- Growatt MIN-TL-X-200K (180.0 kW)
- Battery
- 10 kWh
- Tilt / azimuth
- 16 deg / 190 deg
- Bird mesh
- Not installed
- Tariff
- Rs 44 per kWh
- Net metering
- Approved
- NM reference
- NM-2025-12836
- Sanctioned
- 200 kW
- AMC
- Annual Plus
Unresolved defects on this site.
Heavy soiling on lower rows
MinorDust accumulation reducing output on the two lowest rows more than the rest of the array.
Burnt MC4 connector
CriticalDC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.
String mismatch on MPPT 2
MajorString currents differ by 18 percent, pointing to partial shading or module degradation.
String mismatch on MPPT 2
MajorString currents differ by 18 percent, pointing to partial shading or module degradation.
Warranty documents missing
InfoModule warranty pack not on file. Copies requested from the original installer.
9 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0158 | Performance Testing | Invoiced | Rs 9.0K |
| JOB-2026-0053 | String Testing | Completed | Rs 6.8K |
| JOB-2026-0029 | Solar Panel Repair | Completed | Rs 12.3L |
| JOB-2026-0067 | Shade Analysis | Completed | Rs 8.5K |
| JOB-2026-0052 | System Health Audit | Completed | Rs 12.0K |
| JOB-2026-0017 | Performance Optimization | Invoiced | Rs 1.9L |
| JOB-2026-0063 | Performance Testing | Invoiced | Rs 9.0K |
| JOB-2026-0162 | Inverter Upgrade | Completed | Rs 16.4L |
| JOB-2026-0152 | Bird Dropping Removal | Invoiced | Rs 3.5K |
- IV Curve TestingScore 72
2 Jun 2026
- Earthing Resistance TestingScore 60
10 May 2026
Generation figures are modelled against the design estimate for this system.