Operations console

Customers

Indus Packaging Ltd

200.0 kW Hybrid system in Rawalpindi, commissioned 5 Nov 2021

System health

66

Performance ratio against baseline, less open defects

Generated (30 days)

21.3 MWh

94% of expected

Modelled soiling loss

5.7%

Last cleaned 28 Jun 2026

Performance ratio

74.8%

Baseline 79%, target 82%

Generation, expected against actual

Ninety days. The dashed line is the design expectation; the gap between the lines is money.

Soiling loss

Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.

Performance ratio trend

Against the fleet target.

System specification
Capacity
200.0 kW
System type
Hybrid
Modules
323 x 620W Canadian Solar
Inverter
Growatt MIN-TL-X-200K (180.0 kW)
Battery
10 kWh
Tilt / azimuth
16 deg / 190 deg
Bird mesh
Not installed
Tariff
Rs 44 per kWh
Net metering
Approved
NM reference
NM-2025-12836
Sanctioned
200 kW
AMC
Annual Plus
Open findings

Unresolved defects on this site.

  • Heavy soiling on lower rows

    Minor

    Dust accumulation reducing output on the two lowest rows more than the rest of the array.

  • Burnt MC4 connector

    Critical

    DC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.

  • String mismatch on MPPT 2

    Major

    String currents differ by 18 percent, pointing to partial shading or module degradation.

  • String mismatch on MPPT 2

    Major

    String currents differ by 18 percent, pointing to partial shading or module degradation.

  • Warranty documents missing

    Info

    Module warranty pack not on file. Copies requested from the original installer.

Work order history

9 visits

CodeServiceStatusAmount
JOB-2026-0158Performance TestingInvoicedRs 9.0K
JOB-2026-0053String TestingCompletedRs 6.8K
JOB-2026-0029Solar Panel RepairCompletedRs 12.3L
JOB-2026-0067Shade AnalysisCompletedRs 8.5K
JOB-2026-0052System Health AuditCompletedRs 12.0K
JOB-2026-0017Performance OptimizationInvoicedRs 1.9L
JOB-2026-0063Performance TestingInvoicedRs 9.0K
JOB-2026-0162Inverter UpgradeCompletedRs 16.4L
JOB-2026-0152Bird Dropping RemovalInvoicedRs 3.5K
Inspection reports

Generation figures are modelled against the design estimate for this system.