JOB-2026-0067 - raised via Website 3 mo ago

CompletedLow priorityAnnual Plus AMC
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Burnt MC4 connector

    Critical

    DC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.

    Open

  • String mismatch on MPPT 2

    Major

    String currents differ by 18 percent, pointing to partial shading or module degradation.

    Open

  • Hotspot detected on string B

    Critical

    Thermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.

    Resolved

Parts used

Consumed from van stock on this visit.

No parts consumed

Result

Generation either side of the visit.

+51 kWhper day

739 kWh before, 790 kWh after

Worth about Rs 67,320 a month at this site's tariff.

Assignment

Technician

Faisal Shahzad
Details
City
Rawalpindi
Capacity
200.0 kW
Raised
17 May 2026, 12:00 PM
Scheduled
18 May 2026, 8:00 AM
SLA due
18 May 2026, 12:00 PM (3 mo ago)
Completed
18 May 2026, 8:00 AM
Services
Shade Analysis
Amount
Rs 8,500