Operations console
Performance Testing
JOB-2026-0158 - raised via AMC schedule 4 days ago
6 of 6 steps complete
Defects recorded on site. Unresolved criticals roll up to the operations overview.
Loose structure bolt
MinorTwo mid-clamps below torque specification on the north row. Retorqued.
Resolved
Burnt MC4 connector
CriticalDC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.
Resolved
Heavy soiling on lower rows
MinorDust accumulation reducing output on the two lowest rows more than the rest of the array.
Open
Consumed from van stock on this visit.
No parts consumed
Generation either side of the visit.
634 kWh before, 795 kWh after
Worth about Rs 212,520 a month at this site's tariff.
Technician
Faisal Shahzad- Customer
- Indus Packaging Ltd
- City
- Rawalpindi
- Capacity
- 200.0 kW
- Raised
- 14 Aug 2026, 9:00 AM
- Scheduled
- 15 Aug 2026, 3:00 AM
- SLA due
- 15 Aug 2026, 9:00 AM (3 days ago)
- Completed
- 15 Aug 2026, 3:00 AM
- Services
- Performance Testing
- Amount
- Rs 9,000
Repeat visit for the same fault. Root cause review required before another call-out.