Operations console
Pak Agro Farms - Unit 1
25.0 kW On-Grid system in Karachi, commissioned 10 Nov 2022
System health
50
Performance ratio against baseline, less open defects
Generated (30 days)
2.4 MWh
86% of expected
Modelled soiling loss
11.9%
Last cleaned 27 May 2026
Performance ratio
71.5%
Baseline 83%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 25.0 kW
- System type
- On-Grid
- Modules
- 46 x 545W Canadian Solar
- Inverter
- Solis S6-GR1P-25K (22.5 kW)
- Battery
- None
- Tilt / azimuth
- 27 deg / 170 deg
- Bird mesh
- Not installed
- Tariff
- Rs 45 per kWh
- Net metering
- Approved
- NM reference
- NM-2025-93840
- Sanctioned
- 25 kW
- AMC
- Commercial Pro
Unresolved defects on this site.
Hotspot detected on string B
CriticalThermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
Inverter derating in afternoon peak
MajorUnit throttles above 46 degrees ambient. Cooling fins clogged with dust.
Warranty documents missing
InfoModule warranty pack not on file. Copies requested from the original installer.
Burnt MC4 connector
CriticalDC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.
Heavy soiling on lower rows
MinorDust accumulation reducing output on the two lowest rows more than the rest of the array.
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0037 | School & Hospital Solar Maintenance | Scheduled | Rs 24.0K |
| JOB-2026-0032 | Performance Optimization | Completed | Rs 23.8K |
| JOB-2026-0151 | Wiring Inspection & Repair | Completed | Rs 8.2K |
| JOB-2026-0165 | Performance Testing | Invoiced | Rs 9.0K |
| JOB-2026-0169 | Cable Replacement | Completed | Rs 12.2K |
| JOB-2026-0137 | Junction Box Repair | Invoiced | Rs 4.5K |
- Shade AnalysisScore 97
28 Feb 2026
- System Health AuditScore 97
16 Mar 2026
Generation figures are modelled against the design estimate for this system.