Operations console
Falcon Logistics - Unit 2
60.0 kW On-Grid system in Lahore, commissioned 27 Feb 2023
System health
79
Performance ratio against baseline, less open defects
Generated (30 days)
6.3 MWh
93% of expected
Modelled soiling loss
3.9%
Last cleaned 7 Aug 2026
Performance ratio
78.8%
Baseline 85%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 60.0 kW
- System type
- On-Grid
- Modules
- 97 x 620W Jinko
- Inverter
- Solis S6-GR1P-60K (54.0 kW)
- Battery
- None
- Tilt / azimuth
- 19 deg / 190 deg
- Bird mesh
- Not installed
- Tariff
- Rs 40 per kWh
- Net metering
- Approved
- NM reference
- NM-2023-49024
- Sanctioned
- 60 kW
- AMC
- Commercial Pro
Unresolved defects on this site.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
Earthing resistance above limit
MajorMeasured 9.4 ohm against a 5 ohm reference. Earth pit needs re-treatment.
String mismatch on MPPT 2
MajorString currents differ by 18 percent, pointing to partial shading or module degradation.
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0015 | Combiner Box Repair | Scheduled | Rs 7.8K |
| JOB-2026-0048 | Electrical Safety Audit | Requested | Rs 15.0K |
| JOB-2026-0084 | Dust & Debris Removal | Scheduled | Rs 3.2K |
| JOB-2026-0040 | Preventive Maintenance | Invoiced | Rs 8.5K |
| JOB-2026-0016 | Junction Box Repair | Completed | Rs 4.5K |
| JOB-2026-0129 | Technical Reports | Invoiced | Rs 6.5K |
No reports for this site