Falcon Logistics - Unit 1
32.0 kW On-Grid system in Lahore, commissioned 16 Oct 2025
System health
71
Performance ratio against baseline, less open defects
Generated (30 days)
3.3 MWh
91% of expected
Modelled soiling loss
6.7%
Last cleaned 10 Aug 2026
Performance ratio
75.2%
Baseline 83%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 32.0 kW
- System type
- On-Grid
- Modules
- 55 x 585W Longi
- Inverter
- Solis S6-GR1P-32K (28.8 kW)
- Battery
- None
- Tilt / azimuth
- 13 deg / 170 deg
- Bird mesh
- Installed
- Tariff
- Rs 46 per kWh
- Net metering
- Approved
- NM reference
- NM-2023-65503
- Sanctioned
- 32 kW
- AMC
- Commercial Pro
Unresolved defects on this site.
Heavy soiling on lower rows
MinorDust accumulation reducing output on the two lowest rows more than the rest of the array.
Inverter derating in afternoon peak
MajorUnit throttles above 46 degrees ambient. Cooling fins clogged with dust.
Burnt MC4 connector
CriticalDC connector on string C shows arcing damage. Replaced on site and adjacent connectors re-terminated.
7 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0023 | Residential Solar Maintenance | Requested | Rs 6.5K |
| JOB-2026-0170 | Combiner Box Repair | Requested | Rs 7.8K |
| JOB-2026-0167 | Factory Solar Maintenance | Scheduled | Rs 32.0K |
| JOB-2026-0095 | Earthing Resistance Testing | Completed | Rs 5.2K |
| JOB-2026-0060 | Battery Check & Replacement | Completed | Rs 38.0K |
| JOB-2026-0038 | MC4 Connector Replacement | Completed | Rs 3.4K |
| JOB-2026-0057 | Annual Maintenance Contract (AMC) | Invoiced | Rs 48.0K |
- Insulation Resistance TestingScore 60
29 Apr 2026
Generation figures are modelled against the design estimate for this system.