7.5 kW On-Grid system in Karachi, commissioned 24 Jan 2023
System health
80
Performance ratio against baseline, less open defects
Generated (30 days)
759 kWh
90% of expected
Modelled soiling loss
8.6%
Last cleaned 6 Apr 2026
Performance ratio
76.3%
Baseline 85%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 7.5 kW
- System type
- On-Grid
- Modules
- 12 x 620W JA Solar
- Inverter
- Solis S6-GR1P-8K (6.8 kW)
- Battery
- None
- Tilt / azimuth
- 26 deg / 170 deg
- Bird mesh
- Not installed
- Tariff
- Rs 51 per kWh
- Net metering
- Approved
- NM reference
- NM-2026-24358
- Sanctioned
- 8 kW
- AMC
- No contract
Unresolved defects on this site.
Bird nesting under array
MinorPigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.
Heavy soiling on lower rows
MinorDust accumulation reducing output on the two lowest rows more than the rest of the array.
String mismatch on MPPT 2
MajorString currents differ by 18 percent, pointing to partial shading or module degradation.
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0141 | Inverter Repair & Maintenance | Dispatched | Rs 14.5K |
| JOB-2026-0014 | MC4 Connector Replacement | Requested | Rs 1.7K |
| JOB-2026-0080 | Warranty Claims | Dispatched | Rs 4.5K |
| JOB-2026-0041 | Off-Grid Solar System | Invoiced | Rs 34 |
| JOB-2026-0103 | Solar Panel Deep Cleaning | Completed | Rs 2.6K |
| JOB-2026-0130 | Solar EV Charger Installation | Invoiced | Rs 1.7L |
- Earthing Resistance TestingScore 85
5 Apr 2026
Generation figures are modelled against the design estimate for this system.