Earthing Resistance Testing

RPT-2026-013 - performed 5 Apr 2026 by Waqar Ahmed

Health score

85

Measurements taken

6

0 outside reference

Findings

2

Customer visibility

Shared

Measurements

Each reading against the reference it is judged by.

MeasurementReadingReferenceResult
Open circuit voltage (string A)702 VWithin 5% of designPass
Short circuit current (string A)12 AWithin 8% of nameplatePass
Earth electrode resistance1.7 ohmBelow 5 ohmPass
Insulation resistance (DC+ to earth)58 MohmAbove 1 MohmPass
Max module temperature48 CBelow 25 C above ambientPass
Performance ratio on test day66%Baseline 85%Pass
Context
Customer
Sana Iqbal
Capacity
7.5 kW
Work order
JOB-2026-0103
Technician
Waqar Ahmed
Recommendation

Bring cleaning forward by one cycle and re-torque the affected strings within 30 days.

Score 85 / 100
Findings

Defects recorded during this inspection.

  • Bird nesting under array

    MinorOpen

    Pigeons nesting between modules and roof. Bird mesh recommended for the full perimeter.

  • Heavy soiling on lower rows

    MinorOpen

    Dust accumulation reducing output on the two lowest rows more than the rest of the array.