Operations console

All work orders

On-Grid Solar System

JOB-2026-0019 - raised via Portal 28 days ago

CompletedNormal priority
Checklist

6 of 6 steps complete

Findings

Defects recorded on site. Unresolved criticals roll up to the operations overview.

  • Heavy soiling on lower rows

    Minor

    Dust accumulation reducing output on the two lowest rows more than the rest of the array.

    Resolved

  • Loose structure bolt

    Minor

    Two mid-clamps below torque specification on the north row. Retorqued.

    Resolved

Parts used

Consumed from van stock on this visit.

PartQtyUnit costLine total
Lithium Battery 5kWh3Rs 40,505Rs 121,515
Bypass Diode Kit1Rs 23,320Rs 23,320
Result

Generation either side of the visit.

+9 kWhper day

45 kWh before, 54 kWh after

Worth about Rs 13,770 a month at this site's tariff.

Assignment

Technician

Danish Ali
Details
Customer
Ayesha Malik
City
Faisalabad
Capacity
12.0 kW
Raised
21 Jul 2026, 10:00 AM
Scheduled
23 Jul 2026, 1:00 AM
SLA due
24 Jul 2026, 10:00 AM (25 days ago)
Completed
23 Jul 2026, 1:00 AM
Services
On-Grid Solar System
Amount
Rs 27