Chughtai Diagnostic Centre
32.0 kW On-Grid system in Lahore, commissioned 28 Mar 2020
Generation figures are modelled against the design estimate for this system.
Operations console
32.0 kW On-Grid system in Lahore, commissioned 28 Mar 2020
System health
90
Performance ratio against baseline, less open defects
Generated (30 days)
3.3 MWh
90% of expected
Modelled soiling loss
10.3%
Last cleaned 11 Jun 2026
Performance ratio
76.8%
Baseline 85%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
Unresolved defects on this site.
No open findings
6 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0119 | Panel Replacement | In progress | Rs 11.6L |
| JOB-2026-0115 | Earthing Resistance Testing | Scheduled | Rs 5.2K |
| JOB-2026-0079 | Earthing Resistance Testing | Completed | Rs 5.2K |
| JOB-2026-0135 | Thermal Camera Inspection | Invoiced | Rs 22.4K |
| JOB-2026-0050 | Solar System Routine Checking | Completed | Rs 5.5K |
| JOB-2026-0039 | Inverter Upgrade | Invoiced | Rs 2.6L |
No reports for this site