Operations console
Kamran Yousaf
15.0 kW Hybrid system in Lahore, commissioned 23 Nov 2025
System health
80
Performance ratio against baseline, less open defects
Generated (30 days)
1.6 MWh
92% of expected
Modelled soiling loss
7.0%
Last cleaned 27 Jul 2026
Performance ratio
75.8%
Baseline 82%, target 82%
Ninety days. The dashed line is the design expectation; the gap between the lines is money.
Climbs between washes, drops sharply after rain or a clean. The dashed line is the point where a cleaning visit pays for itself.
Against the fleet target.
- Capacity
- 15.0 kW
- System type
- Hybrid
- Modules
- 26 x 585W Canadian Solar
- Inverter
- Growatt MIN-TL-X-15K (13.5 kW)
- Battery
- 5 kWh
- Tilt / azimuth
- 16 deg / 170 deg
- Bird mesh
- Not installed
- Tariff
- Rs 51 per kWh
- Net metering
- In process
- NM reference
- NM-2024-14660
- Sanctioned
- 15 kW
- AMC
- No contract
Unresolved defects on this site.
Hotspot detected on string B
CriticalThermal scan shows a cell running 27 degrees above array average. Bypass diode failure suspected.
4 visits
| Code | Service | Status | Amount |
|---|---|---|---|
| JOB-2026-0035 | Free Performance Report | Requested | Rs 0 |
| JOB-2026-0161 | Commercial Solar Installation | Scheduled | Rs 26 |
| JOB-2026-0068 | 25-Year Performance Monitoring | Cancelled | Rs 96.0K |
| JOB-2026-0144 | Factory Solar Maintenance | Completed | Rs 32.0K |
No reports for this site
Generation figures are modelled against the design estimate for this system.