6 of 6 steps complete
Defects recorded on site. Unresolved criticals roll up to the operations overview.
Warranty documents missing
Module warranty pack not on file. Copies requested from the original installer.
Open
Consumed from van stock on this visit.
| Part | Qty | Unit cost | Line total |
|---|---|---|---|
| String Fuse 15A | 2 | Rs 2,645 | Rs 5,290 |
| Torque Wrench Calibration | 2 | Rs 9,741 | Rs 19,482 |
Generation either side of the visit.
18 kWh before, 23 kWh after
Worth about Rs 7,350 a month at this site's tariff.